- Boiler Control Panel
- Cleaning door, uppermost
- The boiler’s combustion room
- Hot combustion chamber
- Cleaning door lowest
- Fire observation flap
- Air Apertures for the combustion
- Fill/drain faucet (on type 2.5 this is placed between the fire box and the hopper)
- a. Drain plug for air chamber (on type 2.5 this is placed directly over the bottom frame on the right-hand side.
- Combustion chamber arch
- Cleaning opening (for hopper)
|
- Fuel worm conveyor/auger (transports the fuel to the combustion chamber).
- Burn back safety flood valve
- Blower (provides air for the combustion)
- N/A
- Air intake (there is one of these on both sides and they are removable panels)
- Ash cleanout cover (there is one of these on both sides)
- Cover for hopper (reversible)
- Flue gas exhaust collar
- Supply and return connections
|